LTA - Replacement works of DFC Rail Fastening System to Delkor RF167
Low Stiffness Fastening System on SMRT Circle Line.
SMRT - Long rail change, 72m + 54m + 36m + 36m + 18m + 3m all within one night during engineering hours.
SMRT - Rectification work on 2 curves YCK to KTB N/B during engineering hours,
up to 24 sleepers replaced per night.
SMRT - Replacements of rail, timber sleepers, baseplates, ballasts, third rail,
high/low speed ramps & brackets (including fabrication), etc, during engineering hours.
SMRT - Installation of Delkor Egg for in-track trial & reinstatement for
Singapore Land Transport Authority on behalf of SMRT during engineering hours.
SMRT - Replacement of coach screws on SMRT existing track during engineering hours.
SMRT - Installation of a channeling system and application of corrosion inhibitor
at the tunnel segment joints in 4 MRT tunnel sectors during engineering hours.
PSA – Introduction of thermit weld.
PSA – Modifications & replacements of various quay crane trolley rail designs.
PSA - Replacement of trolley rail pad on HSHI quay cranes at Brani Terminal.
Rail & rail pad on ZPMC quay cranes at PasirPanjang Terminal.
SATS - Replacement / installation of A120 rail in Singapore Airport Terminal Services (SATS) cargo complex.
SBS Transit N.E. Line - Fast clip system coring.
SBS Transit N.E. Line - Supply, fabricate & install Insulated Rail Joints (IRJ).